If at first you don’t succeed, try again. More than a century after the D.R. Moon Memorial Library first opened its doors in Stanley, a long-awaited expansion and renovation project has brought new …
This item is available in full to subscribers.
To continue reading, you will need to either log in, using the login form, below, or purchase a new subscription.
If you are a current print subscriber, you can set up a free website account and connect your subscription to it by clicking here.
Otherwise, click here to view your options for subscribing.
Please log in to continue |
If at first you don’t succeed, try again. More than a century after the D.R. Moon Memorial Library first opened its doors in Stanley, a long-awaited expansion and renovation project has brought new life to one of the community’s most recognizable historic landmarks.
The effort didn’t happen overnight, nor was it without challenges. Behind the now complete construction project was and is a history of planning, fundraising, setbacks and renewed determination stretching back more than three decades.
The original D.R. Moon Memorial Library was dedicated 125 years ago in December 1901, a gift from Sallie Moon in memory of her late husband, Delos Rensselaer Moon Sr.
D.R. Moon Sr. was president of the Northwestern Lumber Company, having transitioned to timber when the bank he worked for (Halls Brothers) was closed by the state comptroller as the Civil War made Missouri securities unprofitable.
Moon partnered with Gilbert Porter and Sumner Thomas McKnight, each of the three focusing on a different aspect of the lumber business. The firm built Porter’s Mills south of Eau Claire at what is now the Porterville Boat Landing before turning its attention north to Stanley, moving company operations to Stanley in the early 1890s.
When Mr. Moon died Nov. 5, 1898, the city was in the process of working to establish a library. Mrs. Moon came forward to offer a memorial to her late husband, which was accepted.
Designed by architect W. Channing Whitney, the D.R. Moon Memorial Library was delayed in construction for weather before finally opening in 1901, at a reported cost of $8,000. It was placed on the National Register of Historic Places on Dec. 2, 1985.
Over the decades it has become a fixture in Stanley, while limitations became increasingly apparent as library services evolved. Among these were that the building lacked adequate accessibility, had limited space for collections and programming, and presented challenges related to electrical systems, insulation, windows and general maintenance.
With limitations apparent, a movement to improve the library started in the late 20th century, originally to find a new home rather than renovate the existing structure.
A historical timeline compiled in part from information provided by longtime area resident Nevin Lein, details the multi year process and its occasional setbacks.
On Nov. 17, 1994, a building fund was opened at F&M Bank at First and Broadway to support a future construction project. The Library Board approved an initial $1,000 deposit on March 30, 1995, and began discussing fundraising and renovation possibilities the following month.
A building committee was then formed in January 1996, followed by preliminary planning for a new library. Board members toured the combined public and school library in Durand in June 1996 to examine possibilities for Stanley.
By June 1997, the committee was considering renovation of the existing library and acquisition of neighboring properties to provide space for an addition.
On Oct. 24, 1997, the Library Board presented three alternatives to the Stanley City Council: renovate and expand the existing library, combine library services with a public school or municipal building, or construct a new freestanding library.
The board recommended the third option.
The city subsequently discussed acquiring property on Broadway Street and incorporating a library into a proposed municipal building. In January 2000, the city set aside $20,000 for architectural drawings of a municipal facility that would include the library.
The plans, however, did not move forward.
A possibility of combining the public library with the school library later resurfaced in 2011 and 2012. Public meetings were held, and another visit to Durand was arranged. Strong public opposition and a petition bearing more than 700 signatures opposing the combination was presented to the City Council in January 2012. The libraries ultimately remained separate.
Additional discussions in 2013 considered a new municipal building, both with and without the library, on city-owned property along North Broadway. Other municipal priorities, including water, sewer and road improvements, complicated the effort.
Meanwhile, the aging library continued to require maintenance. In November 2013, the Library Board considered relocating to a rented building rather than replacing the library’s heating and air-conditioning equipment. When renting proved too expensive, the improvements were paid for through the building fund.
The next major push began in 2014 and 2015, when Walter Wartolec expressed interest in acquiring the property immediately west of the library to make an addition possible.
A new building committee was formed in February 2015, and members toured six libraries that April to gather ideas.
Architectural firms were interviewed, and Cedar Corporation of Menomonie was selected to develop plans. A fundraising committee was established in July 2015.
A significant contribution came from Walter Wartolec, who provided $65,000 for the project, including $50,000 toward purchasing the neighboring house, $10,000 for demolition and $5,000 for related expenses.
A pass-through fund was established through the Community Foundation of Chippewa County to assist with administering donations.
Cedar Corporation presented three possible renovation and expansion designs in September 2015. The neighboring house was demolished on Oct. 12, making room for future construction, with plans largely mirroring the existing library in outside aspect.
By December, the Library Board had approved a fundraising presentation package and final architectural designs.
Despite the progress, the project again encountered obstacles, and the proposed Cedar Corporation plans were never constructed.
The library continued operating in its historic building as the years passed and leadership changed. It seemed that the project was over, until a renewed effort emerged to choose what had originally been discarded almost two decades prior, the renovation and expansion of the existing library.
A renewed effort emerged under the leadership of Library Director Elizabeth Miniatt, Library Board President Cathy Ryba and other supporters determined to preserve the historic structure while providing modern library services.
Marie and Walter Wartolec’s contribution of adjoining property remained essential to the effort, providing the space necessary to expand westward without abandoning the original building
In January 2018 the Library Board approved a five year plan to include seeking renovation/expansion, before COVID-19 put a pause to these in 2020.
The years 2021 and 2022 were spent in gathering information on library building projects, repeating past steps. An RFQ for Architectural and Engineering Services was posted in summer 2022, with the Library Board choosing River Architects.
The Library Board worked with River Architects to develop plans for a renovation and addition that would preserve the 1901 structure while addressing accessibility and space limitations.
The library partnered with capital consulting firm Baker Street Consulting Group of Stevens Point to conduct a feasibility study in March 2023. A proposal presented publicly in a June 2023 community forum that envisioned increasing the library from approximately 3,234 square feet to a combined facility of about 11,650 square feet. The preliminary estimated cost was approximately $4.2 million.
The plans called for improved accessibility, wider aisles, expanded reading areas, meeting and study spaces, updated electrical systems, improved insulation and dedicated areas for children and teenagers.
Community input helped shape the proposal. Residents expressed support for additional library space while emphasizing the importance of retaining the building’s historic character.
The resulting concept treated preservation and expansion as complementary goals rather than competing priorities.
The fundraising effort became known as the Building Connections Capital Campaign, launched in October 2023.
Volunteer work gained speed, and the campaign was being discussed publicly by January 2024. The next phase was formally introduced during a July 30, 2024, event at the library.
By that time, organizers announced that approximately $1 million had already been raised toward a project estimated at $4.5 million.
More than 30 local volunteers participated in the fundraising effort, demonstrating the broad community involvement behind the project.
Contributions from individuals, organizations and businesses played an important role in advancing the project.
One significant gift came from the Royal Credit Union Foundation, which contributed $110,000 specifically for the library’s children’s area. John Sackett, Doug Olson and Melanie Baumgart presented the donation on Sept. 26, 2024.
Kolbe Windows & Doors also made a substantial contribution, pledging to provide windows for the renovation and expansion, including historically appropriate replacements for the original library.
The donation was initiated by Kolbe Vice President of Finance Mike Tomsyck, whose wife is a Stanley native.
The Friends of D.R. Moon Public Library supported the Building Connections campaign, while the Community Foundation of Chippewa County provided an avenue for receiving and administering project donations.
The campaign reflected a larger community effort to ensure that the library would continue serving Stanley and surrounding communities for generations to come. As time went on Forward Bank and the Stanley Lions pledged to support the project as well.
A decisive financial development came in October 2024, when Gov. Tony Evers’ administration awarded the project $4,137,056 through Wisconsin’s Flexible Facilities Program.
The program was supported by federal funding from the American Rescue Plan Act’s Capital Projects Fund and was intended to improve access to education, broadband, employment opportunities and other essential services.
Designs were refined in response to community feedback, with the expanded library designed for increased use with improvements extending beyond traditional library collections.
Plans included two computer labs with 26 desktop computers, improved high-speed internet access, classrooms, meeting rooms, dedicated children’s and teen areas, and a flexible community space. The teen area is named in honor of Lakken Burzynski.
The facility would provide opportunities for residents to study, work remotely, access technology and participate in educational programming.
On March 10, 2025, the Stanley Common Council unanimously approved a $300,000 contract with River Architects for architectural and engineering services.
A groundbreaking ceremony followed on June 25, 2025, attended by Gov. Evers, city officials, library representatives and community supporters. Library services were maintained at the Stanley Fire Station on First Avenue during construction, with Faith Evangelical Free Church helping with material storage during renovation.
After decades of proposals, fundraising and setbacks, construction was finally underway.
The renovation and expansion presented challenges beyond those of an ordinary construction project.
The original building, constructed in 1901, was not designed to connect with a modern addition. The lack of a conventional subbasement created difficulties in tying the new foundation to the historic structure, requiring additional engineering solutions.
Work inside the original library also revealed unexpected conditions.
During flooring work, contractors discovered linoleum where wood had been anticipated. Removing existing materials exposed the extensive nailing used in the original construction. A new plywood subfloor was installed as part of the renovation.
Care was also taken to preserve elements of the original interior. Former Stanley-Boyd School Superintendent Jim Jones installed bookshelves designed to match the library’s historic shelving.
Miniatt advocated retaining the old hallway entrance as a bookshelf, emphasizing its historical significance.
Other elements of the project were intended to connect the building’s history with its educational mission. Portions of the new construction were designed to leave building components visible, allowing visitors to learn about systems ordinarily hidden behind walls and ceilings.
A peacock mural by Gloria Eslinger was also planned as an artistic addition.
River Architects provided the design, while Hoeft Builders Inc. served as the principal construction and renovation contractor once designs were complete. Numerous subcontractors and specialty businesses contributed to the work as well, including companies involved in excavation, electrical systems, plumbing, roofing, flooring, masonry, elevators and interior finishes.
Together, their efforts helped address the complicated task of combining a historic landmark with a modern public facility.
The D.R. Moon Memorial Library expansion represents far more than additional square footage.
It is the culmination of efforts that began with a building fund in 1994, continued through multiple building committees and architectural proposals, and survived repeated setbacks before finally advancing through community fundraising and a major federal grant administered by the state.
The project also reflects the continuing importance of the original gift made by Sallie Moon more than 125 years ago.
Rather than replacing the library that generations of Stanley residents have known, the community chose to preserve it and build upon its legacy.
For those who participated in the early planning efforts, the completed expansion represents the fulfillment of a vision that once seemed difficult to achieve.
For future generations, it promises a library that combines the character of Stanley’s past with the space, technology and accessibility needed for the years ahead. Officially opened Oct. 5, 2026, the library held a grand opening and ribbon cutting with the Stanley Chamber and community on Nov. 7 of this year.
What began as a memorial to one of Stanley’s early benefactors has since become a testament to the determination of the community itself.
Come check out the library!
The following businesses and individuals contributed to the D.R. Moon Memorial Library Renovation, as posted on the library doors in the new study room area:
Debbie Karlen
Diane Halterman
Don & Jessie Klisiewicz
Donna Stelter-Thompson
Eddie Trevino
Edmond & Rose Miniatt
Elaina Gunelson
Ele’s Flowers
Gloria Eslinger
Greg & Gloria Steivang
Israella Witt
James & Sharon Radford
Jane Burzynski
Jeffery Horrell & Rodney Rose
Jennifer Sallis
Jenny Gerrits
Jim & Sheryl Jones
Joanne Moussette
Kent & Mary Olson
Kevin Hendricksen
Marcella Stark
Mark & Kari Roshell
Michael & Barbara Spurbeck
Michael & Misty Karlen
Michael & Nicole Witt
Patricia Nesterick
Patrick & Phyllis O’Connor
Peter & Matina Ross
Quintin & Rebekah Gruetzmacher
Relevé Dance Studio
Richard Huls
Robert Ebber
Stanley Hometown Dentistry
Stanley-Boyd NHS Students
Sylvia Cieslek
Travis & Amanda Schneider
Lucas & Ketty Clow
Margie Konik
Nancy Orlady
Philip Warren
Print Wisconsin
Rhonda Hoernke
Wayne McCaffery & Sally Topinka
Brad & Michelle Van Dinter
Brenda Bousfield & David Marcus
Caryl Best
Church of the Brethren
Dennis & Mary Dixon
Greg & Gloria Steivang
Hazuga’s True Value
John Pozdell
Joyce Boie
Konrad & Sandra Thorson
Marine Credit Union
Modern Beauty Salon
Our Savior’s Lutheran Church WELCA
Reit’s Garden Center
Rural Electric Supply Cooperative
Wendy & Gary Stelter
Adam & Brianna Smit
Andrea Mahr
Anne Edwards
Athena, Stefan & Julian Gruetzmacher
Barry & Peggy Dalberto
Barry & Karen Eslinger
Betty Nenzel
Brett Harsch & Amy Sodha Harsch
Bruce & Chris Steinhagen
Carol Parke
Charles & Marianne Storm
Citizen’s Community Federal Bank
David Easterbrook & Richard Bough
Forward Bank
Kolbe Windows & Doors
Mike & Julie Tomsyck
Royal Credit Union Foundation
Walter & Marie Wartolec
David & Patricia Jankoski
Diane, Donald, Kathryn & James Weggen
Donna Meyer-Klick & Dennis Klick
John & Cindi Haag
The Stanley Lions
Cathy & Jeff Ryba
James & Michelle Ericksen
Anne & Darrel Diers
Victoria Szatalowicz, MD, FACP
Sharon Szatalowicz
Philip Szatalowicz
Karen Szatalowicz
Michael Szatalowicz
Dr. M.T. & Helen Szatalowicz
Brian Solie
Diane Reppert Charitable Fund
Emma Fronberg
Lisa Simirenko
Tania Simirenko
AgCountry Farm Credit Services
Barb Slowiak
Barbara Powers
Barry Stuttgen
Cheryl Kern-Simirenko
Dennis Smasal
Don & Mary Vanderschaegen
Jeff & Erika Koenig
Joan Blazel
Jody Padgham
Joyce McManus
Keith & Josie McCaffery
Lagrander’s Hillside Dairy